Siberian Sea

Category: Refrigeration

136’ Freezer Longliner.  In addition to regular service, in 2012 we planned and executed upgrading the system’s two compressors from Sabroe SAB-128s to Mycom 160 VLDs while dockside in Dutch Harbor, AK.  The new compressors were mounted on the existing compressor frames which were modified as needed to accommodate the larger compressors, motors, oil pumps and oil piping system while tying all the controls into the existing Unisab II controllers.